Columbia 30TPH Biomass Boiler Installation Site News-Zozen. On May 5, 2016,Columbia 30 ton biomass boiler project site came the latest news that the boiler is expected to conduct and complete hydrostatic test before the end of May. Then the installation work will enter into refractory & insulation installaing, furnace drying and boiling etc stages.
Read MoreCopyright © 2021.Boiler All Rights Reserved.